2004-01-02 Underslab 2 inch insulation for radiant flooring.
2004-01-05 House material on Truck #1
2004-01-05 Unloading.
2004-01-05 Straw down to keep mud under control.
2004-01-14 Garage beams going in.
2004-01-14 Garage joists being hung.
2004-01-14 First wall tilted into place.
2004-01-16 Last truss.
2004-01-18 Radiant floor tubing going in.
2004-01-22 Garage siding going on.
2004-01-24 Planning chimney location.
2004-02-01 Shingles after the snow.
2004-02-25 Siding almost done.
2004-02-26 House radiant tubing layed.
2004-02-27 House basement slab being poured.
2004-03-10 House logs being stacked.
2004-03-10 Inside view.
2004-03-12 More logs stacked.
2004-03-14 The lovely General Contractor takes a day off to add to the work force.
2004-03-17 Letting the neighbors know there is a new member of the family.
2004-04-24 Second floor walls tilted into place.
2004-04-28 Setting beams into place.
2004-04-28 Ridge beam lowered in place.
2004-04-28 View looking up.
2004-04-28 Last beam.
2004-05-10 Roof framing.
2004-05-12 Framing in prow.
2004-05-14 Installing windows in the prow.
2004-05-16 Felting in the prow.
2004-05-16 Gleaming stainless chimney about sprout through the roof.
2004-05-17 Insulation in the garage.
2004-05-20 Drywall in the garage.
2004-11-15 Middle ring of cistern being lowered.
2004-11-16 Almost final grade, view side.
2004-11-16 Road side. Still need to put Sikkens on the Garage.
2004-11-26 Buddy Chris Doyle helps lay the inverted tree of PVC pipe for water collection to cistern.
2004-12-23 Instead of working on the house, I'll be digging myself out!
Last updated Sun Aug 21 21:38:03 EDT 2005